2nd Light Forums |
Topic Title: Bridge Over Sebastian Inlet to be Replaced Topic Summary: Created On: 10/08/2019 05:07 AM |
Linear : Threading : Single : Branch |
- dingpatch | - 10/08/2019 05:07 AM |
- Long Beard | - 10/08/2019 10:51 AM |
- fishkller | - 10/08/2019 06:25 PM |
- johnnyboy | - 10/09/2019 06:02 AM |
- Plan B | - 10/09/2019 07:01 AM |
- SoMlbBch007 | - 10/09/2019 07:16 AM |
- matt_t | - 10/09/2019 09:02 AM |
- SoMlbBch007 | - 10/09/2019 10:11 AM |
- SurferMic | - 10/09/2019 11:20 AM |
- Julianuribe23 | - 10/10/2019 05:53 AM |
- e11even | - 10/10/2019 12:50 PM |
- surfrc | - 10/10/2019 02:03 PM |
- dingpatch | - 10/10/2019 02:57 PM |
- Cole | - 10/11/2019 06:42 AM |
- HAPDigital | - 10/11/2019 08:36 AM |
- daner | - 10/11/2019 08:40 AM |
- HAPDigital | - 10/11/2019 09:10 AM |
- TRIBULATIONexodus | - 10/11/2019 11:59 AM |
- GreenLantern | - 10/11/2019 02:17 PM |
- HAPDigital | - 10/12/2019 09:31 AM |
- fishkller | - 10/12/2019 01:59 PM |
- HAPDigital | - 10/12/2019 04:09 PM |
- Cole | - 10/13/2019 09:54 AM |
- sfds | - 10/15/2019 09:31 AM |
- SurferMic | - 10/15/2019 01:13 PM |
- e11even | - 10/15/2019 01:21 PM |
- sfds | - 10/16/2019 07:19 AM |
- e11even | - 10/16/2019 12:38 PM |
- sfds | - 10/16/2019 02:27 PM |
- daner | - 10/12/2019 02:31 PM |
- daner | - 10/18/2019 06:42 AM |
- fishkller | - 10/18/2019 06:04 PM |
- Cole | - 10/18/2019 07:58 PM |
Topic Tools
|
10/11/2019 11:59 AM
|
|
See a problem, solve a problem, make a few bucks.
Someone should contact a ferry to come down for the year.
There are four licensed ferry companies in Florida. Licensed were Havana Ferry Partners of Fort Lauderdale, Baja Ferries of Miami, United Caribbean Lines Florida of Greater Orlando and Airline Brokers Co. of Miami and Fort Lauderdale.
|
|
|
|
10/11/2019 02:17 PM
|
|
confused
6 years before they start and it will take 6 years to build???? something is wrong maybe 6 years before they start but 6 years to build ??? |
|
|
|
10/12/2019 09:31 AM
|
|
confused [IMG][/IMG] 6 years before they start and it will take 6 years to build???? [IMG][/IMG] something is wrong maybe 6 years before they start but 6 years to build??? [IMG][/IMG] [IMG]https://media3.giphy.com/media/104UnLyTpxo28o/giphy.gif[/IMG] Edited: 10/12/2019 at 09:33 AM by HAPDigital |
|
|
|
10/12/2019 01:59 PM
|
|
Bridge being out shouldn't be a problem for them Duke Boys.. Odd that they are saying it was damaged during Dorian though- that storm barely knocked palm fronds to the ground. ------------------------- Pro Puppy-Killer Party 2024 Edited: 10/12/2019 at 02:07 PM by fishkller |
|
|
|
10/12/2019 04:09 PM
|
|
Bridge being out shouldn't be a problem for them Duke Boys.. Odd that they are saying it was damaged during Dorian though- that storm barely knocked palm fronds to the ground. LOL or James bond. |
|
|
|
10/13/2019 09:54 AM
|
|
The estimate for the rebuild is one year.
The giant ramps will be completed is just under a month. ------------------------- I was right. |
|
|
|
10/15/2019 09:31 AM
|
|
FDOT post storm inspection........
same organization that brought us the recent A1A road improvements? Same org that is bringing us a completely unneeded Ellis I-95 ramp between 192 and Eau Gallie? Same org that just coned off 100% of IHB thru Indialantic to put in a handful of medians that should have been put in when they made previous said A1A improvements?
More clownage from one of the worst run gubment orgs we have. I hope someone challenges the merit of their findings.........
|
|
|
|
10/15/2019 01:13 PM
|
|
^^^ The exit off I95 it to grow the Melbourne-Orlando International airport. "The airport exit", was it needed??..not really, in the future 10-20 yrs from now..yeah maybe a good idea, we will see. I wonder what will happen to Ellis road. The A1A medians are for crosswalks that are being built currently, the cones were needed so they could dig then go directly to the next spot and dig; it was a huge machine doing the work...cones are now being taken away, was not much of a delay maybe an extra two to three minutes? I have had one friend (RIP Art Stroud) and a neighbor hit and killed crossing A1A in my area, crosswalks way overdue. The bridge..well that is going to be a huge project, bike lanes, maybe taller? Not sure where the money will come from ...FDOT? Sebastian Beach Tax District? Hopefully they can patch fix the structure rather than full replacement. I do not know much about the damage. Did you vote for the .05 tax increase? Not even going to start on the muck removal boondoggle.
Edited: 10/15/2019 at 01:18 PM by SurferMic |
|
|
|
10/15/2019 01:21 PM
|
|
------------------------- - |
|
|
|
10/16/2019 07:19 AM
|
|
Oh boy this will be fun. The stated purpose of the Ellis ramp is to "allevite traffic" from 192 and Eau Gallie "for the airport". Because you know, soooooooooooo many people are influxing by car from the N and S to fly out of Melbourne.
As a matter of fact, I work off John Rodes. This ramp is going to make it worse!!!! This money should have been used to 4 lane Ellis and John Rodes end to end which is so badly needed. I dont see how you possibly think adding more traffic onto 2 lanes of Jon Rodes is going to help?
A1A crosswalks - I have learned to like them, though they were poorly thought out. One of my points was - why were the ones they are working now not added at the time they just re-paved A1A and put alllllll the other crosswalks in a year ago?? typical FDOT. Come back a year later and cut up the concrete.
They coned off the entire lanes 100% from IHB to 192 including all the intersections. Then there was not a worker around for atleast a week. Do you know why they re-did the cones in a more efficient manner recently? Because people were calling them (Melanie) saying WTF why is Eau Gallie turning onto N A1A coned off for a median 1/2 mile up the road, it makes no sense. Why is Paradise coned off? So they "re-evaluated" and reworked the cones and I agree its much better now and I understand they need them for safety. But why not think it thru and put them how they are now in the first place? Because FDOT thinks nothing through before they do it...
Back to the subject at hand - I hope someone challenges the inspection. Sounds like someone wants to build a new bridge, bike lanes and all. toodles.
|
|
|
|
10/16/2019 12:38 PM
|
|
Ya sfds totally agree that a ramp for the "Airport" is BS. And ya ellis and john rodes needs to be 4 laned but you dont think this ramp will help to alleviate the traffic backed up at 5pm for those that have to take john rodes to I-95? Of course it will.
------------------------- - |
|
|
|
10/16/2019 02:27 PM
|
|
Yes, I see what you're saying. I hope so.
|
|
|
|
FORUMS
:
Surfing
:
Bridge Over Sebastian Inlet to be Replaced
|
Topic Tools
|
FuseTalk Basic Edition - © 1999-2024 FuseTalk Inc. All rights reserved.
First there was Air Jordan .