2nd Light Forums |
Topic Title: Army Corps to begin Cocoa Beach sand project Topic Summary: Created On: 03/16/2021 01:34 PM |
Linear : Threading : Single : Branch |
Topic Tools
|
03/16/2021 01:34 PM
|
|
Army Corps to begin Cocoa Beach sand project
Jim Waymer, Florida Today 5 hrs ago Cocoa Beach - the Space Coast's premier tourism spot - soon will see new sands, dredged up and pumped in from shoals several miles offshore of Cape Canaveral. a close up of a sign: Dredges are expected to begin widening Cocoa Beach with new sand on or around March 20, 2021.© TIM SHORTT/FLORIDA TODAY Dredges are expected to begin widening Cocoa Beach with new sand on or around March 20, 2021. The U.S. Army Corps of Engineers will begin placing the new sand on the so-called North Reach section of its Brevard County Shore Protection Project "on or about March 20," Corps officials announced this week. The effort will put about 465,000 cubic yards of sand on the southern four miles of the 9.8-mile long North Reach shoreline, from Patrick Space Force Base to North Second Street in Cocoa Beach. https://www.msn.com/en-us/news...nd-project/ar-BB1eE6G0 Edited: 03/16/2021 at 01:34 PM by Central Floridave |
|
|
|
03/16/2021 07:39 PM
|
|
Anybody remember how fired up we were and tried to fight this?
Dredge and fill really mess up the surf breaks. Oh well. |
|
|
|
03/16/2021 08:01 PM
|
|
To make matters worse, the bars are in fine shape. Nice long combers.
------------------------- I was right. |
|
|
|
03/17/2021 11:31 AM
|
|
This was supposed to begin on March the 1st ( I thought that the powers that be : ie the Hotel /Tourism Industrial Complex ----had some how managed to stall the project , until after Spring Break , but they appear to be going forward with it right in the middle ! ) With any luck ,they might bury the lot of them, so we don't have to put up with their drunken stupidity !
Edited: 03/17/2021 at 03:56 PM by JOESTRUMMER |
|
|
|
03/17/2021 12:36 PM
|
|
Doing it right on top of some of my go-to spots
|
|
|
|
03/17/2021 01:03 PM
|
|
If Satty beach is a good indicator........then it will take roughly 365 days after sand dumping before the breaks start to come back from PSFB to North Second Street.
------------------------- Waiting for waves is ok......most people spend their lives waiting for nothing. |
|
|
|
03/17/2021 02:05 PM
|
|
The wind swell combo is getting ready to do a number on the new dirt at Patrick.
------------------------- I was right. |
|
|
|
03/17/2021 02:51 PM
|
|
The wind swell combo is getting ready to do a number on the new dirt at Patrick. So did the last one. I had a 3-4 foot jump down from the dune to the hardpack at NoClub. |
|
|
|
03/17/2021 04:58 PM
|
|
|
|
|
|
03/19/2021 08:33 AM
|
|
Dredge pipe showing on surfline 16th st cam...boo hiss
|
|
|
FORUMS
:
Surfing
:
Army Corps to begin Cocoa Beach sand project
|
Topic Tools
|
FuseTalk Basic Edition - © 1999-2024 FuseTalk Inc. All rights reserved.
First there was Air Jordan .